FRAME Mediapark Brussels
Project information
Construction project
Frame Brussel Media ParkCustomer
BAM InterbuildConstruction
Boskalis Infra Nederland BVLocation
Brussels , BEConstruction time
April 2021 - September 2025Products used
Project details

Situation
For the Frame Brussels Media Park, the architects were looking for a sun-shading solution that would not only provide effective solar protection but also integrate seamlessly with the overall ar chitectural design. To support the decision-making process, a mock-up was developed, allowing the different options to be evaluated in a realistic setting. The main challenge was to reduce solar heat gain on the building’s large south-facing glass façade. Initially, a movable shading system was considered. However, due to the scale and complexity of the project, this solution proved impractical. Since the large steel structure in front of the façade consisted of a grid of square elements, it was important that this geometric pattern was reflected in the mesh design as well, creating a cohesive visual appearance. HUESKER provided a prototype that enabled the architects to assess the aesthetic and functional performance of the solution
Challenge
The type of mesh was selected. Horizontal and vertical strips were attached to this mesh so that the squares of the frame would also be reflected in the mesh. The key question here was what di mensions the panels should have so that they could be installed neatly stretched without creases. After creating a test screen, a few adjustments were still needed to the dimensions and construction of the fabric. In total, 40 screens measuring 7.5 x 7.5 metres were installed in June/July 2025 at a height of 10 to 40 metres.
Solution
After a long period of testing and evaluation, they opted for an open mesh because of stability with straps criss-cross welded on and tensioned according to the ‘folding gate’ principle.