HUESKER Ltd.
Space2work Warrington
Winwick Quay
WA2 8LT Warrington
United Kingdom

Innovative drainage solution for an industrial lot condominium

Project information

Construction project

Brasporto Industrial Lot Condominium

Customer

Construtora e Incorporadora Brasporto

Construction

Ribeiro Aquino Pavimentadora e Construtora

Location

Jacareí, São Paulo , BR

Planing

Solofund Engenharia

Construction time

May 2026 to July 2026

Products used

Project details

Situation

The development of the Brasporto industrial lot condominium, in Jacarei, Brazil, required treatment of the designated street area, where the soils were subject to significant settlement.

To accelerate settlement and soil consolidation and to shorten waiting times, the design called for vertical wick drains (prefabricated vertical drains) installed on a 1.5 m square grid, to an average depth of 13 m.

In certain sections, two surcharge fills of 2.6 m each were planned, with a 130-day waiting period required for each stage. Total settlement could reach 1.5 m in the worst-case scenario, which called for adequate monitoring of ground behavior throughout construction.

A joint analysis by the technical and commercial teams of HUESKER and Fixsolo Soluções Construtivas, a HUESKER representative for more than 20 years and responsible for brokering the supply and supporting implementation, led to an innovative geosynthetic solution that was applied for the first time on a project in Brazil.

 


Challenge

For the treatment of the street area, the original design provided a drainage solution based on a sand drainage blanket, a conventional technique for creating a drainage path at the base of embankments over soft soils. After carrying out studies, Brasporto chose to replace this technique with Hydrain® WAS7. This drainage geocomposite, developed by HUESKER, consists of extruded monofilaments thermally bonded to two geotextiles for filtration and separation. 

This was the first application of Hydrain® WAS7 in Brazil, an innovation for the domestic market. Because it was a new solution, it was first tested in a small area, which was then accepted by the technical lead and the director of the contracting company after meeting technical and operational expectations. 

Once validated, the product was applied to the rest of the street area, totaling approximately 40,000 m². Monitoring with settlement plates and piezometers helped to control soil behaviour during the surcharge stages, allowing any ground movement in each loading step to be inspected. 

 


Conclusion

Replacing the sand drainage blanket with Hydrain® WAS7 resulted in a lightweight, flexible solution. Installation was simple and quick across an area of approximately 40,000 m² and was supported by the Fixsolo team.

Combined with vertical wick drains, the use of this technology made it possible to accelerate settlement and reduce the waiting times planned for building the streets.

Carrying out a test section made it possible to validate a solution that was new to the country, giving the client the confidence to adopt it across the entire area.

 


Advantages

  • Lightweight, flexible solution that replaces the traditional   

  • sand drainage blanket

  • Simple, quick installation over approximately 40,000 m²

  • Accelerated settlement and shorter waiting times when 

  • combined with vertical wick drains